- Objective
To lay down a procedure for operation of vacuum pump.
- Scope
This SOP is applicable in Quality Control. during filtration of solution through vacuum. .
- Responsibility
QC Chemist / Officer : Follow the procedure and maintain record as applicable.
- Accountability
Head Quality Control : System Compliance
- Procedure:
- Ensure that the vacuum pump is clean and ready for use.
- Connect the three pin plug to power supply.
- Connect the tubes properly with filtration assembly.
- Switch ON the mains.
- Check the pipes for any leakage before starting the filtration.
- After completion of filtration switch OFF the mains.
- Unplug the vacuum pump.
- Clean the pump and nearby area if any spillage takes place.
- If there is any problem in the equipment, inform to engineering department.
- Annexure (S)
-NA-
- Reference (S)
Manufacturer manual.
- Glossary
SOP : Standard Operating Procedure
QC : Quality Control
QA : Quality Assurance
- Revision History
Rev. No. | Details of changes | Reason for change |