- OBJECTIVE
To lay down the procedure for operation procedure for purified water plant.
- SCOPE
This SOP is applicable in operation procedure for purified water plant.
- RESPONSIBILITY
Water system operators/ Engineers | : | To follow the procedure |
- ACCOUNTABILITY
Head Engineering : System Compliance
- PROCEDURE:
- Ensure the purified water plant is clean and dust free.
- After preparation of RO water or during RO water preparation.
- Start the pump for purified water preparation.
- Ensure the all valve is open for drain the water.
- Back wash the Cation for 15 minute and then close it.
- Back wash the Anion for 15 minute and then close.
- Ensure the all valve is closed after back wash of cation and anion.
- Operate the mixed bed.
- If conductivity or pH value is not give the under acceptance criteria; open the valve and drain the water.
- Conductivity and pH value reading fill in the format F-SOP/EN/014/02-01; check the value after 1 hour and check continuously.
- Water pass through UV tubes; maintain the record of UV light burning record.
- Store the purified water in purified water storage tank and start the water circulation pump.
- Maintain the record of operation log OF purified water plan.
TRAINING
Trainer : Head – Quality Assurance& Engineering Department.
Trainees : Engineering- Executive & Supervisors.
DISTRIBUTION
Master Copy : Quality Assurance Department
Controlled Copy : Engineering Department
Display Copy : Engineering Department (If Required)
ATTACHMENTS
Sr. No. | Annexure No. | Title | Format No. |
1 | NA | NA | NA |
- REFERENCES
In-house
ABBREVIATION
Abbreviation | Extended Form |
EG | Engineering |
SOP | Standard Operating Procedure |
QA | Quality Assurance |
NA | Not Applicable |
REVISION HISTORY OF CHANGE
Sr. No. | Date | Revision Details | Revision No. |