- OBJECTIVE
To lay down the procedure for integrity testing of cartridge filter.
- SCOPE
This SOP is applicable in the procedure for integrity testing of cartridge filter.
- RESPONSIBILITY
Water system operators/ Engineers | : | To follow the procedure |
- ACCOUNTABILITY
Head QA & Engineering :System Compliance
- PROCEDURE
- Pre-Start up:
- Close the air vent of filter housing.
- Check the tightness of the clamp. It should not be loose at the connections.
- Ensure that compressed air is available at pressure of 4 to 6 kg/cm2.
- Start up:
- Wet the cartridge filter water for injection or Iso propyl alcohol through the filter housing.
- Open the filter housing so that air is removed from the vent and close the air vent when water for injection or Iso propyl alcohal droplet starts oozing out.
- Connect the filter housing inlet to outlet of integrity instruments.
- Connect the compressed air supply to the inlet of integrity testing instruments.
- Open the valve of compressed air supply line and adjust the pressure between 4-6kg/cm2 for the integrity testing instrument.
- Connect the power supply of the instrument and with on the instruments
- Integrity testing instruments sis itself start the self-test programme.
- During this test instruments check the correct functioning of internal communication, Inlet pressure, Pressure transducer, valve and regulator are checked. An internal test also carried out.
- After completion of self-test -instruments display the main menu press the ‘‘Bubble point’’ then after screen the bubble point test.
- Pre-Start up:
- Inter the pin and password then press ok. Screen display the bubble point test programme select the test programme and press ok
- Check the test programme and enter the details.
- Press the start to run the machine in bubble point test, pressure develop up to 700mbar (10PSI) these instruments check the pressure leak in the filter.
- During the measurement phase of the test, pressure increased and the simultaneously instruments measure the pressure decay.
- When the develop pressure attain the specified minimum bubble point line then test result display ‘‘BP within limit’’ and if develop pressure not attain the specified bubble point line then test result display ‘‘BP outside limit’’ so filter is defective.
- If the fails in integrity on reject the filter and replace it with new filter and check its integrity
Shut Down:
Disconnect the integrity testing apparatus from the filter housing. Increase a sterilizing grade filter which is used for filtration of nitrogen, fails in integrity test (post) , inform the production manager andquality assurance , the production manager to initiate an investigation in consultation with Q.A. for the failure.
Frequency:
Every 15 days for airline cartridge filter/after dissembling filter from the line. Before and after sterilization of cartridge filter. Before and after filtration of water for injection /Disinfectant solution IPA.
TRAINING
Trainer : Head – Quality Assurance& Engineering Department.
Trainees : Engineering- Executive & Supervisors.
- DISTRIBUTION
Master Copy : Quality Assurance
Controlled Copy : Engineering Department
Display Copy : Engineering Department (if Required)
ATTACHMENTS
Sr. No. | Annexure No. | Title | Format No. |
1 | NA | NA | NA |
- REFERENCES
In-house
ABBREVIATION
Abbreviation | Extended Form |
EG | Engineering |
SOP | Standard Operating Procedure |
QA | Quality Assurance |
WH | Warehouse |
NA | Not Applicable |
MB | Microbiology |
REVISION HISTORY OF CHANGE
Sr. No. | Date | Revision Details | Revision No. |