- OBJECTIVE
To lay down the procedure for cleaning and operation of Blister packing machine
- SCOPE
This SOP is applicable for Cleaning & Operation of Blister Packing machine.
- RESPONSIBILITY
- Operator will operate and clean the Blister Packaging Machine.
- Section Head shall be responsible for the verification of Operation and Cleaning of Blister Packing Machine and implementation of this SOP.
- ACCOUNTABILITY
- Department Head & QA Head shall be accountable for compliance of this SOP.
5.0 PROCEDURE
5.1 OPERATION
- Check the status label “CLEANED” on blister machine.
- Take the approval from in process quality assurance for the cleanliness.
- Switch “ON” the main electrical supply and Blister Machine and keep compressed air valve, chilled water
Supply valve in “ON” position.
- Set the parameter as per data provided:
- Compressed Air Pressure: NLT 4.0 kg/cm2
- Forming roller Heater: 140-160°C
- Sealing roller Heater: 170- 200°C
- As per the details of Batch Manufacturing Record, Stick the Batch Printing Stereo on the Stereo Drum.
Load the PVC/PVDC film roll and Aluminum foil roll on respective holders.
- Pour ink to the Batch code-printing unit.
- Allow achieving the set Temperature and Pressure.
- Take out impression of the stereos on the foil and get it Approved from Q.A. and Production
against the batch details as per Batch Manufacturing Record.
- Set the PVC/PVDC through forming roller and after formation of cavity pass it through sealing guide roller
and set the punching tool to get the desired shape of strip.
- Set the Aluminum foil through the sealing heater and PVC/PVDC wave and ON the pressure switch so that
the sealing heater can seal the aluminum foil to the PVC/PVDC foil wave.
- Check the empty strip in every aspect, Blister formation, Coding and Leak Test.
- Fill the Hopper with Capsules, which are to be packed and switch on the main feeder.
- Set vibrator and in feed motor speed to ensure adequate feeding of Capsules.
- Perform the Leak Test and get Approval from Q.A. Personnel.
- Connect Blister belt and Conveyor Belt for On-line packing.
- After completion of the batch Switch “OFF” the Blister Machine.
- Affix status label “TO BE CLEANED” to the blister machine duly filled and signed by competent technical
Staff.
- Record all the observations in Blister Machine log book.
- CLEANING
- Affix the status label “UNDER CLEANING” to the blister machine.
- Switch “OFF” the main power supply and the Blister Machine.
- Keep compressed air valve, chilled water supply valve in OFF position.
- Clean all materials of previous batch from surrounding area and machine
- Clean hopper lid, hopper, vibrating plate, feed box, feeding roller and feeding channel with vacuum, nylon
brush and lint free cloth.
- Clean forming heater, forming die, guide track and pressure plate with lint free cloth.
- Clean sealing heater with brass wire brush.
- Clean Punching tool assembly with lint free cloth.
- Clean machine body, control panel, machine base with nylon brush and lint free cloth with 70% IPA.
- Affix status label
“CLEANED” to the blister machine duly filled and signed by competent staff.
- Record all the observations in Blister Machine log book.
- TRAINING
Trainer : Head – Production Department
Trainees : Staff and machine operator of Production and QA chemist.
7.0 DISTRIBUTION
Master Copy : QA Department
Controlled Copy : Production Department
Display Copy : Production Department (If Required)
8.0 ATTACHMENTS
Sr. No. | Annexure No. | Title | Format No. |
1 | NA | NA | NA |
9.0 REFERENCES
In-house
10.0 ABBREVIATION
Abbreviation | Extended Form |
EG | Engineering |
SOP | Standard Operating Procedure |
QA | Quality Assurance |
WH | Warehouse |
NA | Not Applicable |
MB | Microbiology |
11.0 REVISION HISTORY OF CHANGE
Sr. No. | Date | Revision Details | Revision No. |
1 | NA | NA | NA |