SOP FOR INSPECTION OF CAPSULE

OBJECTIVE

To describe the procedures for inspection of soft gelatin capsules. 

2.0       SCOPE

This SOP is applicable procedure for inspection of soft gelatin capsules.

3.0       RESPONSIBILITY

            Production Chemist & operator      : To follow the procedure

4.0      ACCOUNTABILTY:

     QA & Head Production                  : For system compliance

     5.0       PROCEDURE

      5.1      After unloading transfer the capsules to inspection area.

     5.2     Check the bags with ‘In-process Label’ to be taken for Inspection as per SOP.

     5.3     During inspection mention the party name, product name, batch no., mfg. date, exp. date, and

               Batch size, date & shift and chemist’s name batch details on display board.

     5.4     First switch ON the light of inspection table then fill un-inspected capsules in machine hopper  And start the machine conveyor belt and start the inspection of capsules.

     5.5     Following rejects shall be sorted out by comparing to the good capsules but not limited to:      Under size capsules.

  • Over size capsules
  • Deshaped capsules
  • Opaque capsules
  • Leaked capsules
  • Foreign particles on gelatin capsule shell
  • Joint Capsules
  • Air bubble in gelatin shell
  • Different color shades
  • Abnormal physical appearance

     5.6    Defected capsules shall be collect in polybag and labeled as “Rejected Capsules”.

       5.7   Collect the good capsules in Crate after inspection and status label pest on crate than transfer or Polishing in polishing area.              

       5.8  After complete inspection of batch rejected capsules collect and inter the details in BPCR and                Capsules send for destroyed.

6.0       TRAINING

Trainer   : Head Production Department

 Trainees : Staff and machine operator of production and QA chemist.

    7.0       DISTRIBUTION

Master Copy                     :           QA Department

Controlled Copy               :           Production Department  

Display Copy                    :           Production Department (If Required)

  8.0        ATTACHMENTS

Sr.No. Annexure No. Title Format No.
1 NA NA NA
  •   REFERENCES      

In-house

  10.0   ABBREVIATION

Abbreviation Extended Form
EG Engineering
SOP Standard Operating Procedure
QA Quality Assurance
WH Warehouse
NA Not Applicable
MB Microbiology

      11.0  REVISION HISTORY OF CHANGE

Sr. No. Date Revision Details Revision No.
1 NA New SOP 00

Bhanu Pratap Singh

BHANU PRATAP SINGH IS EXPERIENCED IN PHARMACEUTICAL, AUTHOR AND FOUNDER OF PHARMACEUTICAL GUIDESLINE (WWW.PHARMAGUIDESLINE.COM), A WIDELY READ PHARMACEUTICAL BLOG SINCE 2019. EMAIL:- INFO@PHARMAGUIDESLINE.COM

View all posts by Bhanu Pratap Singh →

Leave a Reply

Your email address will not be published. Required fields are marked *

error: Content is protected !!