- OBJECTIVE
To lay down the procedure for operation of RO plant.
SCOPE
This SOP is applicable in Water System for operation of RO plant.
RESPONSIBILITY
Supervisor / Executive : | : | To follow the procedure |
- ACCOUNTABILITY
Head Engineering : System Compliance
- PROCEDURE
- Pre-requisite:
- Ensure the sand filter, carbon filter and dosing units are proper functioning.
- Ensure that RO reject and control valve is fully open
- Operation:
- Open the valve of Raw Water before starting RO plant.
- Switch ON the RO Water System Panel.
- Start the raw water supply pump.
- Back wash the sand filter about 10-15 minute and then back wash closed.
- Back wash the carbon filter about 10 – 15 minute and then back wash closed.
- Open the all valve of supply for drain the water.
- And after 5 minute, high pressure pumps ON.
- Start the Antiscalant dosing during preparation of RO water.
- RO Water prepared about 500 lit and then OFF the RO system.
- Maintain the record of log book of RO Water System.
- Note: If RO water is not used within 48 Hours (2 Days) then drain the RO water & sanitize the tank.
- Pre-requisite:
TRAINING
Trainer : Head – Quality Assurance& Engineering Department.
Trainees : Engineering- Executive & Supervisors.
DISTRIBUTION
Master Copy : Quality Assurance Department
Controlled Copy : Engineering Department
Display Copy : Engineering Department (If Required)
ATTACHMENTS
Sr. No. | Annexure No. | Title | Format No. |
1 | NA | NA | NA |
- REFERENCES
In-house
10.0 ABBREVIATION
Abbreviation | Extended Form |
EG | Engineering |
SOP | Standard Operating Procedure |
QA | Quality Assurance |
WH | Warehouse |
NA | Not Applicable |
RO | Reverse Osmosis |
11.0 REVISION HISTORY OF CHANGE
Sr. No. | Date | Revision Details | Revision No. |