SOP for operation & calibration of Water Bath

  1. OBJECTIVE:

To lay down a procedure for Operation & Calibration of water bath.

  • SCOPE:

This procedure is applicable for procedure for Operation & Calibration of water bath.

  • RESPONSIBILITY:

QC Officer/ QC Executive

  • ACCOUNTABILITY:

QC Manager.

  • PROCEDURE:
    • Operating Procedure
      • Ensure that the instrument is clean and suitable for use.
      • Ensure that all the switches are ‘OFF’ in normal position and the level of water in the water bath is up to the mark.
      • Switch ‘ON’ the main power supply and then switch ‘ON’ the button of the instrument which is located on the front panel & indicator bulb shows green light.
      • Set the desired temperature of water bath by rotating the temperature adjustment knob and indicator bulb shows red light until the set temperature not achieved.  
      • After heating the water, start your work carefully.
      • After completion the work, switch ‘OFF’ the Instrument.
      • Maintain its usage log book.
  • Calibration:
  • Start the instrument and set the temperature at 500C.
  • After achieved the 500C temperature; check the temperature by calibrated thermometer and again check the temperature after 10 minutes.parameter follow for 600C, 700C, 800C, 900C, 1000C & 1100C one by one.
  • Maintain the calibration record of ultrasonic Timer.
  • Frequency of the calibration water – Monthly.
    • Precautions:
      • Instrument should be handled properly.
      • If the instrument does not produce satisfactory results it should be labeled ‘Under Maintenance’ or ‘Out of Order’.
  • TRAINING:

Trainer   : Manager – Quality Control

Trainees : Staff of the QC departments

  • DISTRIBUTION:

Master Copy                  :           QA Department

Controlled Copy            :           QC Department

Display Copy                 :           QC Department

  • ATTACHMENTS:

NA

  • REFERENCES:

In-House

  1. ABBREVIATIONS:
Abbreviations Extended Form
SOP Standard Operating Procedure
NA Not Applicable
QC Quality Control
Sr. No. Serial Number
QA Quality Assurance
DEPT. Department
0C Centigrade
  1. REVISION HISTORY OF CHANGE:
Sr. No. Date Revision Details Revision No.
01 15/01/2017 NEW SOP 00

Bhanu Pratap Singh

BHANU PRATAP SINGH IS EXPERIENCED IN PHARMACEUTICAL, AUTHOR AND FOUNDER OF PHARMACEUTICAL GUIDESLINE (WWW.PHARMAGUIDESLINE.COM), A WIDELY READ PHARMACEUTICAL BLOG SINCE 2019. EMAIL:- INFO@PHARMAGUIDESLINE.COM

View all posts by Bhanu Pratap Singh →

Leave a Reply

Your email address will not be published. Required fields are marked *

error: Content is protected !!