SOP FOR OPERATION & CLEANING OF DOMINO PRINTING MACHINE

1.0 OBJECTIVE

       The Objective of this document is to provide Operating and cleaning procedure for domino printing Machine

2.0 SCOPE

      This Standard Operating Procedure is applicable Operating and cleaning procedure for domino printing Machine .

3.0 RESPONSIBILITY

3.1 Packing Supervisor and operators are responsible to follow this standard operating Procedure.

3.2 Quality assurance is responsible for the compliance of this standard operating procedure.

3.3 Head Production is responsible for the implementation of this standard operating procedure.

4.0 ACCOUNTIBILITY

     Head – Production  

5.0 PROCEDURE

  •  OPERATION

5.1.1 Check machine cleanliness, free from any leftover carton or other packing materials of

         Previous product.  

5.1.2 PackingSupervisor get the planning of printing to printing operator with BPR for batch details.

5.1.3 Set the machine and enter batch details like B.No. , Mfg, Exp, MRP thorough BPR.

5.1.4 Take the trial of overprinting matter on the carton.

5.1.5 When overprinting of batch details are satisfactory, get the signature of from packing supervisor and QA Person on overprinted cartons continue and complete the batch.

5.1.6 Record batch details in overprinting log book.

5.1.7 Attach specimen carton to BPR for reference.

5.1.8 Collect the overprinted cartons in a shipper/Caret and duly labeled with batch details.

5.1.9 Switch off the mains & affixed to be cleaned label and fill the log book. 

5.1.10 Seal the Shipper/Carets till taken for packing store the Shipper/Carets designated area provided.

5.2 Cleaning Procedure

5.2.1 Disconnect the main electrical switch of domino printing machine. 

5.2.2 Remove the all packing materials from printing area.

5.2.3 Clean the outer surface of domino Printing machine and conveyor belt with 70% IPA or thinner.  

6.0  TRAINING

      Trainer   : Head – Production Department

      Trainees : Staff and machine operator of production  and QA chemist.

7.0 DISTRIBUTION

      Master copy                  :     Quality Assurance

      Controlled Copy           :     Production Department

      Display Copy                : Production Department (If Required)

8.0 ATTACHMENTS

       Nil.

  9.0 REFERENCES  

       In-house

10.0 ABBREVIATION

Abbreviation Extended Form
EG Engineering
SOP Standard Operating Procedure
QA Quality Assurance
WH Warehouse
NA Not Applicable
MB Microbiology

11.0 REVISION HISTORY OF CHANGE

Sr. No. Date Revision Details Revision No.
1 NA New SOP 00

Bhanu Pratap Singh

BHANU PRATAP SINGH IS EXPERIENCED IN PHARMACEUTICAL, AUTHOR AND FOUNDER OF PHARMACEUTICAL GUIDESLINE (WWW.PHARMAGUIDESLINE.COM), A WIDELY READ PHARMACEUTICAL BLOG SINCE 2019. EMAIL:- INFO@PHARMAGUIDESLINE.COM

View all posts by Bhanu Pratap Singh →

Leave a Reply

Your email address will not be published. Required fields are marked *

error: Content is protected !!