OPERATION OF DG SET (MAKE: CUMMINS, CAPACITY: 200 KV)

  1. OBJECTIVE

        To lay down the procedure for Operation of DG Set.

  • SCOPE

This SOP is applicable in Engineering for Operation of DG Set (Make: Cummins,

Capacity: 200 kv).

  • RESPONSIBILITY
Supervisor / Executive          : : To follow the procedure  
  • ACCOUNTABILITY

  Head Engineering                       :           System Compliance

  • PROCEDURE
    • Primary Checks:
      • Check the water level in the Cooling tank and the fuel level in fuel storage tank.
      • Ensure the level of lubricating oil level.
    • Starting Procedure:
      • Put the control switch of DG set in START position.
      • Now observe that DG Sets runs without any load. In case the set does not start check the battery supply and rectify.
      • Observe that the RPM of DG increases. Wait till the RPM reaches 1500.
      • Check and ensure that the voltage is 415 ± 5 volts and frequency is between 49 and 51 Hz.
      • Check and ensure that the water outlet temperatures are between 80º C to 90ºC respectively.
      • Put the ACB close button LED will cross the ‘0’ position.
      • Now the generator set supply is ready for feeding the main panel.

Stopping Procedure:

First disconnect load and allow DG set to run in idle mode          

Put DG set in Ideal Position and stop after 2 minutes.

Write all the parameters in the log sheet.

       TRAINING

Trainer   : Head – Quality Assurance& Engineering Department.

            Trainees : Engineering- Executive & Supervisors. 

       DISTRIBUTION

Master Copy                     :          Quality Assurance Department

Controlled Copy               :          Engineering Department  

Display Copy                    :          Engineering Department  (If Required)

  ATTACHMENTS

Sr. No. Annexure No. Title Format No.
1 NA NA NA
  • REFERENCES       

In-house

ABBREVIATION

Abbreviation Extended Form
            EG Engineering
SOP Standard Operating Procedure
            QA Quality Assurance
WH Warehouse
NA Not Applicable
MB Microbiology

      REVISIONHISTORY OF CHANG

Sr. No. Date Revision Details Revision No.
1 19/01/2020 New SOP 00

Bhanu Pratap Singh

BHANU PRATAP SINGH IS EXPERIENCED IN PHARMACEUTICAL, AUTHOR AND FOUNDER OF PHARMACEUTICAL GUIDESLINE (WWW.PHARMAGUIDESLINE.COM), A WIDELY READ PHARMACEUTICAL BLOG SINCE 2019. EMAIL:- INFO@PHARMAGUIDESLINE.COM

View all posts by Bhanu Pratap Singh →

Leave a Reply

Your email address will not be published. Required fields are marked *

error: Content is protected !!