Operation of Vacuum Pump

  1. Objective

To lay down a procedure for operation of vacuum pump.

  • Scope

This SOP is applicable in Quality Control. during filtration of solution through vacuum. .  

  • Responsibility

QC Chemist / Officer     : Follow the procedure and maintain record as applicable.   

  • Accountability

Head Quality Control      : System Compliance

  • Procedure:  
    • Ensure that the vacuum pump is clean and ready for use.
    • Connect the three pin plug to power supply.
    • Connect the tubes properly with filtration assembly.
    • Switch ON the mains.
    • Check the pipes for any leakage before starting the filtration.
    • After completion of filtration switch OFF the mains.
    • Unplug the vacuum pump.
    • Clean the pump and nearby area if any spillage takes place.
    • If there is any problem in the equipment, inform to engineering department. 
  • Annexure (S)

 -NA-

  • Reference (S)

             Manufacturer manual.

  • Glossary           

SOP                    :  Standard Operating Procedure

QC                      :  Quality Control

QA                       :  Quality Assurance

  • Revision History
Rev. No. Details of changes Reason for change
 
 

Bhanu Pratap Singh

BHANU PRATAP SINGH IS EXPERIENCED IN PHARMACEUTICAL, AUTHOR AND FOUNDER OF PHARMACEUTICAL GUIDESLINE (WWW.PHARMAGUIDESLINE.COM), A WIDELY READ PHARMACEUTICAL BLOG SINCE 2019. EMAIL:- INFO@PHARMAGUIDESLINE.COM

View all posts by Bhanu Pratap Singh →

Leave a Reply

Your email address will not be published. Required fields are marked *

error: Content is protected !!