- Objective
To lay down the procedure for working under fume hood.
- Scope
This SOP is applicable in Quality Control during working under fumigation hood. It is used for handling and usage of inflammable solvents, acids and highly volatile solvents.
- Responsibility
Chemist QC
- Accountability
HOD QC
- Procedure
- Cleaning
- Rinse all the glass ware immediately after use with water and send for washing.
- Clean the sink with water.
- Clean the platform with water.
- Mop the hood with clean cloth.
- Preliminary Checks
- Check the hood for proper functioning and switches for their functioning.
- Check the blower for proper functioning.
- Availability of safety dress .i.e. Acid resistant apron, chemical mask, rubber hand gloves and goggles / safety face mask.
- Availability of all reagents / documents / protocols for performing the test.
- Availability of fire safety i.e. sand bucket and fire extinguisher.
- Working
- Enter in the hot zone.
- Adjust the sash height as required
- Cleaning
- Wear the safety dress i.e. Acid resistant apron, rubber
hand gloves and goggles. If required use chemical mask / safety face mask.
- Switch on the tube light marked as tube light.
- Push the green button of the starter, placed at the wall left to hood, to ON the blower.
- Use heating mantle to heat the solution. Do not use hot plate.
- Work as per approved protocols.
- Drain the waste solvents in the sink. Do not drain the acids while hot.
- Rinse all the glass ware with water and send for cleaning.
- Clean the sink and plat form.
- After completion of work, switch off the light and electrical heating if any.
- Switch OFF the blower, by pushing the red button of starter.
- Lower the slash completely after completion of work.
- Important:
- Do not send the glass wares as such for washing.
- Do not switch off the blower while the sash is close.
- If the acid spoiled, first neutralize with base and then wash with water current.
- In case of solvent, spread the sand on the solvent. Clean and send to the ETP.
- In case of any incident immediately take first aid and inform to HOD QC.
- Annexure (S)
NA
- Reference (S)
In House
- Glossary
QC | : | Quality control |
SOP | : | Standard Operating Procedure |
HOD | : | Head of Department |